Apex Hotel,Fleet Street, London
Designed access scaffold with pavement gantry. Main scaffold erected with 2 inside boards and 4 outer boards in 2 metre lifts providing access to all windows for repairs.
Scaffold tied into building using double M16 bolts and Hilti rings.
Monarflex fixed to scaffold on additional framework ensuring a smooth finish
Kingswood Heath, Colchester
Independent scaffold erected progressively as required to suit all trades
Each plot incorporates an individual closed boarded loading bay with an up and over safety gate. Triple handrails are installed to prevent access to open edge whilst gate is in use, complying to working at height regulations
Havenbridge House, Yarmouth
Designed independently tied scaffolding using T ties and M16 bolts
Scaffold boarded at every floor level consisting of 2 metre lifts and 1 metre structural lift
Double rows of Dessa D Series 780 beams used to span pedestrian fire exit and fragile low level roof to rear of building
Kingswood Heath, Colchester
Designed Independent scaffold erected for Timber frame dwellings for Bloor Homes Scaffold erected on a floor by floor basis allowing structure to be tied in providing a safe working platform
Rubbish Chutes and brickguards supplied to allow the safe disposal of waste materials and prevent falls from height
Ikea, Lakeside, Thurrock
Designed access staircase for roof repairs on Ikea Lakeside
The staircase was supported with three buttresses, as due to the nature of the building we were unable to attach physical ties
To prevent unauthorised access the scaffold structure was fitted with an intruder alarm
Kingswood Heath, Colchester
Scaffold erected in accordance with NASC SG4: 15
Advanced handrails installed prior to erecting the next lift of scaffold providing fall protection for our scaffold operatives
Winyard Way, Felixstowe
Residential scaffold erected for new extension. Scaffold erected with 2 inside and 4 outside boards
Scaffold will be erected in progressive lifts to suit all trades
St Marys Field, Colchester
Scaffold erected for client to carry out NHBC remedial works
4 board wide platform erected in 2 metre lifts, to provide access for render repairs
Brick guards, foam sleeves and scaffold lights installed for pedestrian protection
Mayflower Way, Saxmundham
Free standing independent scaffold, erected for re-render works
Scaffold erected to 3 sides of property with 1 inside and 4 outside boards leaving a 6 inch gap from face of property for render access
Scaffold utilising a buttress and rakers for support
Westbourne Grove, London
Independent access scaffold erected for air duct replacement. Scaffold erected with 2 inside and 4 outside boards with a 100mm gap around air duct.
Ladder hatches, gates and brick guards ensure we are providing a safe and compliant scaffold
Vallance Road, London
TG20 designed scaffold providing a screen for demolition works
Pedestrian fan installed over bus stop and approach route as an additional safety measure
Apex Hotel,Fleet Street, London
Independent scaffold, 17m in height erected for steel work construction of internal liftshaft
Scaffold boarded at 2m intervals